Event Summary
 
  FILE SAVED AS: MISO_20993_20200609_0750.htm  
 
 Incident:   MISO_20993_20200609_0750   Date:  06/09/2020 (CST)   Reliability Coordinator:  MISO 
 Initial Conditions:   N/A
 Flowgate:   20993 - Paradise-Big River Tap FLO Wil...   Rating:  0   LODF:  0.00%
 TLR Direction:   Normal 
 Effective StartTime:   06/09/2020 07:50 (CST)   Effective EndTime:  06/09/2020 17:30 (CST)   TLR Duration:  9 Hours and 40 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Jun 09 
07:27 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   0   0 N/A
Jun 09 
08:28 (CST) 
 TLR 5A 
 PRELIM 
 NEXT 
 6-NN 
 7-F 
 Total 
 2 / 0 
 6 / 0 
 8  /  0 
 14 
 94 
 108 
 0.9 
 6.8 
 7.7 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 TVA 
 Total 
 46.0 
 46.0 
 0.0 
 0.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 1.1 
 0.0 
 8.8 
 0.3 
 0.0 
 0.0 
 10.2 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   0   0 N/A
Jun 09 
08:29 (CST) 
 TLR 5A   NEXT 
 6-NN 
 7-F 
 Total 
 2 / 0 
 6 / 0 
 8  /  0 
 14 
 86 
 100 
 0.9 
 6.2 
 7.1 
 14 
 86 
 100 
 0.9 
 6.2 
 7.1 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 TVA 
 Total 
 42.0 
 42.0 
 42.0 
 42.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 1.1 
 0.0 
 7.9 
 0.3 
 0.0 
 0.0 
 9.3 
 0.0 
 0.0 
 1.1 
 0.0 
 7.9 
 0.3 
 0.0 
 0.0 
 9.3 
 0   0   0 N/A
Jun 09 
09:34 (CST) 
 TLR 5A   NEXT 
 6-NN 
 7-F 
 Total 
 3 / 0 
 6 / 0 
 9  /  0 
 16 
 101 
 117 
 1.1 
 7.3 
 8.5 
 16 
 101 
 117 
 1.1 
 7.3 
 8.5 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 TVA 
 Total 
 53.0 
 53.0 
 53.0 
 53.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 1.1 
 0.0 
 9.3 
 0.0 
 0.0 
 0.0 
 10.4 
 0.0 
 0.0 
 1.1 
 0.0 
 9.3 
 0.0 
 0.0 
 0.0 
 10.4 
 0   0   0 N/A
Jun 09 
10:32 (CST) 
 TLR 5A   NEXT 
 6-NN 
 7-F 
 Total 
 3 / 0 
 8 / 0 
 11  /  0 
 16 
 80 
 96 
 1.1 
 5.6 
 6.8 
 16 
 80 
 96 
 1.1 
 5.6 
 6.8 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 TVA 
 Total 
 38.0 
 38.0 
 38.0 
 38.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 2.2 
 0.0 
 6.1 
 0.0 
 0.0 
 0.0 
 8.3 
 0.0 
 0.0 
 2.2 
 0.0 
 6.1 
 0.0 
 0.0 
 0.0 
 8.3 
 0   0   0 N/A
Jun 09 
11:28 (CST) 
 TLR 5A   NEXT 
 6-NN 
 7-F 
 Total 
 3 / 0 
 9 / 0 
 12  /  0 
 16 
 60 
 76 
 1.1 
 4.4 
 5.6 
 16 
 60 
 76 
 1.1 
 4.4 
 5.6 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 TVA 
 Total 
 28.0 
 28.0 
 28.0 
 28.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 2.2 
 0.0 
 4.1 
 0.0 
 0.0 
 0.0 
 6.3 
 0.0 
 0.0 
 2.2 
 0.0 
 4.1 
 0.0 
 0.0 
 0.0 
 6.3 
 0   0   0 N/A
Jun 09 
12:38 (CST) 
 TLR 5A   NEXT 
 6-NN 
 7-F 
 Total 
 3 / 0 
 9 / 0 
 12  /  0 
 16 
 19 
 35 
 1.1 
 1.4 
 2.6 
 16 
 19 
 35 
 1.1 
 1.4 
 2.6 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 TVA 
 Total 
 6.0 
 6.0 
 6.0 
 6.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 2.4 
 0.0 
 0.9 
 0.0 
 0.0 
 0.0 
 3.3 
 0.0 
 0.0 
 2.4 
 0.0 
 0.9 
 0.0 
 0.0 
 0.0 
 3.3 
 0   0   0 N/A
Jun 09 
13:34 (CST) 
 TLR 5A   NEXT 
 6-NN 
 Total 
 3 / 0 
 3  /  0 
 17 
 17 
 1.2 
 1.2 
 17 
 17 
 1.2 
 1.2 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 2.4 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 2.4 
 0.0 
 0.0 
 2.4 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 2.4 
 0   0   0 N/A
Jun 09 
14:38 (CST) 
 TLR 5A   NEXT 
 1-NS 
 6-NN 
 Total 
 0 / 1 
 3 / 0 
 3  /  1 
 0 
 17 
 17 
 0.0 
 1.2 
 1.2 
 0 
 17 
 17 
 0.0 
 1.2 
 1.2 
 65 
 0 
 65 
 3.3 
 0.0 
 3.3 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 2.4 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 2.4 
 0.0 
 0.0 
 2.4 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 2.4 
 0   0   0 N/A
Jun 09 
15:29 (CST) 
 TLR 5A   NEXT 
 1-NS 
 6-NN 
 Total 
 1 / 0 
 3 / 0 
 4  /  0 
 135 
 14 
 149 
 7.0 
 1.0 
 8.0 
 135 
 14 
 149 
 7.0 
 1.0 
 8.0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 2.3 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 2.3 
 0.0 
 0.0 
 2.3 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 2.3 
 0   0   0 N/A
Jun 09 
16:26 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   0   0 N/A
Jun 09 
17:16 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   0   0 N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   1   135   135   65 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   25   140   126   0 
 7   44   440   346   0 
 Total   70   715   607   65 
 
TLR NNL Totals
 CA   NNL Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 TVA   213.0   213.0 
 Total   213.0   213.0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   17.3   16.1 
 FIRM-7   37.1   28.3 
 Total MISO   54.3   44.4 
 PJM   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.6   0.3 
 Total for PJM   0.6   0.3 
 Total   54.9   44.7